NEWS
01.10.24
CONSTRUCTION PROGRESS IN DASING
The construction work of the new town hall in Dasing is now running in full swing. Taking large steps towards completion as well as the move of the administrative community.
In the interiors, the planned spatialities can now be experienced and the materials can be seen and felt. Carpenters, in-house technical workers and flooring installers all work hand in hand to implement every detail as designed.
The facades of all three new buildings and the existing building are now plastered and painted, the togetherness of the ensemble is clearly understood and the urban concept present.
All now eagerly await the advancement of the facade construction and the open wooden slat fold-sliding shutters in front of the office space.
18.07.24
PROJECTS ON SITE AND IN PROGRESS
Summer 2024 is dominated by the realization of three of our projects, the townhall complex in Dasing is progressing towards the move into the premisses in January 25, the seminar building with prayer hall will be ready for the insertion of the timber structure of the Coppola in September, and the housing tower renovation is in the main phase with simultaneous action on facade, roof and internal renovation of all services installations.
10.07.24
REFRESHING VISIT OF THE ROMA ID-BUZZ
The visit of the ROMA Ice-Bus offered a refreshing and delicious break of the daily routine under summerly heat conditions. The office team was professionally assisted by the next generation.
A wonderful idea, a nice treat - many thanks to ROMA !
23.05.24
START OF BUILDING EXECUTION
The technical and energetic thermal renovation of the tower-like early 60s housing complex has started after two years of planning. The housing cooperative decided to execute all building works in inhabited state.
Main works in apartments and facade are expected for completion by early winter 2024. The building phase is due for completion by summer 2025 with the tenant-PV-facade and additional balcony structures.
15.04.24
RAMADAN MUBAREK CONSTRUCTION BEGINS
We wish our clients and their families all the best for a blessed, contemplative, peaceful and healthy Ramadan!
With Ramadan, the construction of the first section of the seminar building begins with the shell construction and closing of the building envelope. We wish IKZ Hidaje and everyone involved in the realization a trouble-free and successful construction.
01.03.24
1:1 MODEL OF WOODEN DOME CONSTRUCTION
The design for the dome of the prayer hall represents a bridge between the abstract geometric design principles of Islamic sacred building and modern, innovative engineering timber construction. Based on the parametric model of the rotation-ellipsoid of the dome construction, a section of this filigree structure was assembled in the workshop of Holzbau Amann and presented to the construction team for approval.
Holzbau Amann GmbH : www.holzbau-amann.de
07.12.23
MERRY CHRISTMAS AND HAPPY NEW YEAR
At the end of the year, we wish all our business partners, colleagues and friends a merry Christmas, happy holidays and good health, confidence and success for the coming year. We would like to thank you for the successful cooperation, your support and trust.
Our office will be closed from December 22nd, 2023 up to and including January 5th, 2024.
04.12.23
ONSET OF WINTER
Winter stops the construction work, the time to pause is approaching, for the holidays, family and friends. Projects continue well planned in the New Year.
22.11.23
TOPPING OUT CEREMONY CITY HALL DASING
We are pleased to be able to celebrate the completion of the shell of the new town hall building in Dasing.
We are very happy that this has worked so well so far, that there is such good cooperation on the construction site, the direct exchange, the appreciation of each other and the good and hard work on the construction site. We thank everyone involved for this! We wish everyone to continue as well as until now, hope for good weather, no accidents and good cooperation on the construction site to realize this beautiful and important project for Dasing.
Happy topping out ceremony!
31.10.23
OFFICE TRIP
This year we set off together to the Großer Ahornboden. The great weather gave us a wonderful hike and many unforgettable views of the impressive Karwendel landscape. A great opportunity to take a little break from everyday office life, soak up the last rays of sunshine and spend a nice day together.
13.09.23
START OF BUILDING EXECUTION OF FORECOURT WALL
With a new fencing and redesign of the entrance area of the New Apostolic Church in Munich Laim, the local situation is taken into account and the sacred building is spatially framed towards the public. Protective yet without creating a disruptive barrier.
This measure is carried out in junction with maintenance works on the facade and interior renovation work after a fire in the building.
11.09.23
BUILDING PERMISSION
Approval for the energetic renovation, modernization an balcony extension of an apartment building from the 1960s in Germering.
29.03.23
BUILDING PERMISSION
Nach fast 3 Jahren und einem sehr komplexen Genehmigungsverfahren freuen wir uns mit unseren Bauherren, dass wir rechtzeitig zum Fastenmonat und Frühlingsbeginn die Baugenehmigung für den Neubau eines Vereinshauses mit Seminarräumen und Gebetsraum erhalten haben.
30.03.23
GROUNDBREAKING CEREMONY
Festive groundbreaking by Mayor Andreas Wiesner, Building Authority Director Karl Gamperl, Head of Department Svenia Rosette, Urban Development Promotion of the Government of Schwaben, John Höpfner and District Master Builder Andres Richter, as official start of the construction of the town hall ensemble in Dasing after the preliminary work was completed according to plan with excavation, shoring and archaeological investigations.
20.02.23
BUILDING PERMISSION
Approval for the energetic renovation and modernization of an apartment building from the 1960s with two-storey roof extension in Munich-Gern. 2 generous penthouse apartments with spacious loggi will be built on the existing building in lightweight timber construction.
10.02.23
STATE FUNDING FOR URBAN DEVELOPMENT
The redevelopment area in the center of Dasing with several new buildings, conversion of the barn building and the newly created squares and open spaces is being funded by the Federal Republic of Germany with the federal state urban development program ‘social cohesion’ and the Free State of Bavaria.
06.02.23
START OF BUILDING EXECUTION
The fist steps of the realization of the new village heart and townhall ensemble have started with excavation and shoring structures. Within 2 years 3 new buildings and several piazzas, gardens and orchards will be realized, als an ensemble that follows the steep slope from listed church with its walled yard right down to the maypole in an orchard with preserved apple trees.
Photo: Karl Gamperl
09.01.23
BUILDING PERMISSION
Building permission grated for the housing project in München Harlaching. The Housing projects is designed to preserve the garden-city character, by keeping the mature trees and the old garden wall, and with a sloping building skin with pine wood timber slates. The timber hybrid structure contains 8 apartments of different typology and size to allow a mixed community of inhabitants, families, elderly, singles and couples.
22.12.22
MERRY CHRISTMAS AND A HAPPY NEW YEAR
We wish our clients, project partners, consultants, colleagues and friends Merry Christmas, a Happy New Year and a peaceful festive time. We would like to express our thanks for the good cooperation and the togetherness in 2019.
Please not that the office will be closed between 22. 12. 2022 - 09. 01. 2023.
08.11.22
FESTIVE CEREMONY 50 YEARS OF BAYERISCHE ARCHITEKTENVERSORGUNG
The anniversary of the Bavarian Architects´ Pension Scheme (Bayerische Architektenversorgung), founded in 1971, was celebrated in the presence of Minister of State Joachim Herrmann and many invited guests from the Architects Chambers of Bayern, Niedersachsen, Rheinland-Pfalz, the state supervisory authority, the Bayerische Versorgungs-kammer and the self-government on November 8th in the Hubertus Hall in the Nymphenburg Palace with speeches by Joachim Hermann, Bavarian State Minister of the Interior, for Sport and Integration, John Höpfner, Chairman of the Committee of the Bavarian Architects` Pension Scheme and
Daniel Just, Chairman of the Board of Directors of the Bayerische Versorgungskammer.
Photos: Carolin Jacklin
24.07.22
OFFICE EXCURSION TO BRNO
The 3-day excursion to Moravia took us to incunabula of modern architecture, the urban development of the city of Brno with many historic buildings and exemplary contemporary buildings by our Czech colleagues. The highlight of the trip was the visit to Villa Tugendhat (1928 - 1930) by Ludwig Mies van der Rohe and Lilly Reich, expertly guided by Jan Sapák, a recognized expert and author of the book on Villa Tugendhat. The professional approach to the culture of Brno was complemented culinarily, with fine Moravian dishes and drinks.
We are now looking forward to incorporate the many impressions and inspirations into our ongoing projects.
28.06.22
HEARING IN THE STATE PARLIAMENT ON BUILDING TYPE E - AN INITIATIVE OF THE BAVARIAN CHAMBER OF ARCHITECTS
Today, planners of all disciplines have to build with a view to the essentials, adequately, sustainably and quality-oriented. This requires freedom that also enables the qualified professional groups to feed their technical expertise into the process through innovative thinking. The Bavarian Chamber of Architects proposes the introduction of a "building type E".
With a "building type E" the Bavarian Chamber of Architects advertises an additional offer within the Bavarian Building Code. This is primarily aimed at a competent builder. Expert builders and planners, should thus be given the freedom to reduce their project to the actual core of the protection goals of the Bavarian building code (stability, fire protection, healthy living conditions and environmental protection). This step is to be supported by a civil law opening clause be flanked at federal level, which enables expert contracting parties to agree on a "building type E" as a special property in the contract with legal certainty, deviating from the applicable recognized rules of technology.
Right at the beginning, Chamber President Prof. Lydia Haack presented the Chamber's motivation for introducing a "building type E": "The climate change must now be advanced as quickly as possible. Neither the readjustment of standards nor numerous building reduction commissions have so far achieved tangible results. We are convinced that the Bavarian Building Code is a valuable instrument for the success of the climate change, but currently still offers too little leeway for innovative approaches. The hearing itself is available on the state parliament's YouTube channel.
To the report and the statement by Prof. Lydia Haack (President of the Bavarian Chamber of Architects)
05.04.22
NEW TOWN HALL DASING: DECISION FOR IMPLEMENTATION
In a special session, the Dasingen municipal council dealt with the planning for the new administration complex. The committee was very satisfied with the proposals from Haack + Höpfner Architekten and commissioned the offices involved with the implementation planning.
To the newspaper article of the Aichacher Zeitung from April 7th, 2021
17.12.21
MERRY CHRISTMAS
An eventful year lies behind us, with changes and challenges that nobody expected in this way. The good thing is that together we not only managed to cope with the circumstances, but also to shape a lot in a positive way and to bring it forward, despite the restrictions for the mutual cooperation, which we have become all the more aware of as a special value. With this in mind, we would like to thank you for the good cooperation, your support and your trust.
We wish you and your loved ones a peaceful holiday and good health, confidence and success for the New Year.
Our office closes from December 22nd, 2020 up to and including January 9th, 2021.
07.12.21
NEW BUILDING TOWN HALL DASING: DECISION FOR THE WOODEN SLAT FACADE
In the parish council meeting of the parish of Dasing, the parish councils voted very clearly, with 16: 2 votes, in favor of the planned facade. The previous skepticism about the building material wood and the narrow slats as filters also in front of the windows has not least dispelled a visualization of the new town hall. On the contrary, the design was praised as being award-worthy and the possibility of cladding the existing building in this way was expressed as an idea.
"It's a healthy mix of new and old" from the point of view of a council member.
To the Newspaper articles or e-paper of the Aichacher Zeitung from December 9th, 21st
21.10.21
L’EMPREINTE D’UN HABITAT - CONSTRUIRE LÉGER ET DÉCARBONÉ AUSTELLUNGSERÖFFNUNG IM PAVILLON DE L’ARSENAL, PARIS
The exhibition, “The Footprint of a Dwelling”, analyzes thirty or so of these experimental constructions built between 1920 and 2020 that reflect the development of lightweight construction in industrialized countries. The pursuit of lightness isn’t a new one. The ambition of lowering the amount of material used in construction started one century ago in the context of a shortage of housing and materials. With the urgency to build more homes and the requirement to use fewer resources, a number of pioneers are inventing alternative architecture approaches. They are Richard Buckminster Fuller, Charlotte Perriand, Pierre Jeanneret, Albert Frey, Lawrence Kocher, Walter Gropius, Konrad Wachsmann, Jean Prouvé, Charles and Ray Eames, Makoto Masuzawa, Jorn Utzon…
The exhibition is presented chronologically around the 8 × 8 BCC house, designed by Jean Prouvé and Pierre Jeanneret, focussing on the comparative carbon footprint analysis of all experimental buildings. Being average in the comparison of carbon footprint per m2 of building envelope, the micro compact home is unique by its spatial organization which enables high usability, comfort and great flexibility within a minimum of space. By this the volume is reduced to a fraction in relation to a conventional internal layout and therefore lighter, using less material and allowing for an even smaller carbon footprint. Also outstanding is that the village of 7 micro compact homes is inhabited continuously since 2005. The experimental house has proven its suitability for everyday use.
01.10.21
NEW NEUFERT BAUENTWURFSLEHRE ‘ARCHITECTS DATA’ IN 43. EDITION
The project ‘micro compact home’ has been included into the new edition of the internationally renowned Architects' Data (German: Bauentwurfslehre), also simply known as the Neufert, a reference book for spatial requirements in building design and site planning. First published in 1936 by Ernst Neufert its 43 German editions and translations into 17 languages have sold over 500,000 copies.
Now three projects of our practice have become part of this compendium of exemplary design, the modular design for pumping stations (Allguth Tankstelle Unterföhring, page 254), the Glass Car Wash (Gläserne Waschstraße Germering, page 255) and now the ‘micro compact home’ on page 363.
14.09.21
BUILDING PERMISSION RÖMERHANG, WITHIN 10 WEEKS !
Joint effort of all involved participants, especially the support by the local authorities, made it possible to receive building permission for the additional buildings of this residential complex in Landsberg / Lech within such short time. The two buildings in hybrid timber construction contain 42 apartments and, framed by a continuous hedge a roof edge, a generous roof garden area and approx. 120 m2 of solar panels.
We thank all involved parties and now look forward to the realization.
16.07.21
URBAN PLANNING COMPETITION PUBLIC SPACES AT TOWN HALL EFFELTRICH
The design proposal of a generous multifunctinal public space which we developed with Jühling & Köppel Landschaftsarchitekten just missed the the price range. Many thanks to the design team !
06.07.21
RESIDENTIAL COMPLEX RÖMERHANG
POSITIVE RESPONSE BY DESIGN ADVICE COUNCIL
The design and building application for two additional housing blocks in timber hybrid construction was developed and handed in under extreme time pressure. In the subsequent presentation the design council received the proposals very positively, with one remark. The elegant feature of a floating light pergola should be even more generous. The city granted the additional building volume. We expect building permission soon.
17.06.21
DESIGN START TOWN
CENTRE DASING
The design and input planning for the new town centre in Dasing was started and should be completed with the building application in the course of the year. We are looking forward to working with everyone involved!
28.06.21
LYDIA HAACK IS THE NEW PRESIDENT OF THE BAVARIAN CHAMBER OF ARCHITECTS
The 13th Representative Assembly of the Bavarian Chamber of Architects elected architect and urban planner Prof. Lydia Haack as Chamber President at its constituent meeting on June 25, 2021. By virtue of its legal mandate, the Bavarian Chamber of Architects represents the professional interests of more than 25,000 architects, interior architects, landscape architects and urban planners. This includes ensuring the performance quality of the profession as well as promoting building culture and also the necessary consumer protection.
Newly elected 1st vice president is architect Prof. Clemens Richarz. To the further vice-president landscape architect and town planner Franz Damm was appointed.
In addition to the President and the two Vice-Presidents, the members of the Chamber Board for the next five years are:
Dipl.- Ing. Univ. Karlheinz Beer, architect, town planner, Weiden
Dipl.- Ing. (FH) Annette Brunner, interior architect, Munich
Prof. Dr.-Ing. Natalie Eßig, architect, Bamberg
Dr.-Ing. Jörg Heiler, architect, urban planner, Kempten
Dipl.-Ing. Univ. Ariane Jungwirth, urban planner and architect, Munich
Dipl.-Ing. Univ. Doris Lackerbauer, architect, Ruhpolding
Dipl.- Ing. (FH), M. Eng. David M. Meuer, architect, Munich
28.06.21
CHAMBER ELECTION 2021
"I am very grateful for the trust the voters have placed in me and I look forward to working together. The Bavarian Chamber of Architects faces major challenges in making the profession fit for the future. These include climate protection, digitization and the promotion of young talent. Together with the board and the office, we will tackle these and all other tasks with the necessary respect and openness, as a Team"
– Lydia Haack after her election.
07.05.21
RANK 24 - ARCHITECTS
We are very pleased to receive the positive review from competitionline.
19.04.21
SUSTAINABLE AND FLEXIBEL
The New Apostolic Church in Munich Laim
Conservation of resources, energy efficiency, flexibility of use and simple modular building constructions determine the work of our office as self-evident components of integral planning and design.
The New Apostolic Church is CO2-neutral. The community center is heated or cooled with a PV system and groundwater heat pump and feeds annual energy surpluses into the public grid.
The flexible floor plan makes it possible to variably change the congregation rooms and to expand the sacred space from 200 to 500 seats. This makes it possible to continue to hold services for the congregation under the current spacing regulations.
13.04.21
BLESSED RAMADAN
We wish a blessed, contemplative, peaceful and healthy holy month of Ramadan !
01.04.21
HAPPY EASTER
Easter marks the beginning of the time when people can meet outdoors to shop at markets and squares and enjoy a sunny weather, the blossoming of the trees and a vivid cityscape. Especially in times of the pandemic, a well-designed public spaces, such as the as the yet unrealized Viehmarktplatz in Fürstenfeldbruck - favorite of the citizens after a multi-stage selection process - are particularly valuable for our society.
We wish you a happy Easter and stay healthy !
29.03.21
INTERDISCIPLINARY WORK
The spatial design of a sacred space interprets geometric principles of Islamic culture with a dome supported by radially offset pairs of arches. A spatial staging of the supporting structure geometry, the visible wooden surfaces of columns, arches and dome interior, as well as the dark shimmering room boundary with fluted plaster surfaces is achieved via the lighting design. 33 Overhead floodlights radiate from the lower edge into the supporting structure of arches and bays. Around the central skylight, 5 rings of 33 integrated LED spotlights illuminate the individual compartments and light the interior. The lighting control system makes it possible to set flexible lighting accents as needed or to ensure good conditions for reading, for example.
Lighting design Prof. Michael Schmidt www.mslicht.de
12.03.21
PARAMETRIC MODEL
The design for the dome of the prayer hall is based on geomteric priciples of islamic art, with a 33 fold rotation of timber arches forming a central skylight. The structure of this oblate rotational sphere is constructed with beech plywood, due to its loadbearing capacity. On the basis of a digital 3d-concept model and in close collaboration with our team our partners Holzbau Amann and Design to Production developed a parametric model of the rotational ellipsoid sphere. Thus it was possible to define the segmentation of the filigrane structure consisting of 5-achs-milled plywood segments and optimise these for material efficient production and fast erection on site. A design process which is bridging traditional islamic art and modern digital timber engineering.
Holzbau Amann GmbH
Digital Design | Fabian Scheurer
27.02.21
THE MODEL DECAYS, THE BUILDING WILL LAST
The development of our projects is based on a step-by-step approach, research, analysis of refrences, intense co-operation with our clients and consultants, also sketches, 3d-studies and many models. These range from urban planning scale to mass models, concept and materiality models, to 1:1 mock-ups and details of building components. Especialy concept and materiality models are made of basic and simple materials, related to the desired object in surface, haptic or play of light....
11.12.20
RESTAURATION OF A LISTED HOUSING COMPLEX
The Yearbook of Architecture presents a selection of contemporary architectural projects around varying themes in Austria, Gemany and Switzerland. Excellent architecture is informed by complex relationships, as a response between individuality and contextual demands, under consideration of economy and sustainability. Five chapters, focussing on spaces for human presence in architecture follwing the Titles of ‘Corporate’, ‘infrastructure’, ‘Culture’, ‘Education’ and ‘Housing’, are showing projects with special relationship to their local context and environmental issues.
11.12.20
RESTAURATION OF A LISTED HOUSING COMPLEX
The Yearbook of Architecture presents a selection of contemporary architectural projects around varying themes in Austria, Gemany and Switzerland. Excellent architecture is informed by complex relationships, as a response between individuality and contextual demands, under consideration of economy and sustainability. Five chapters, focussing on spaces for human presence in architecture follwing the Titles of ‘Corporate’, ‘infrastructure’, ‘Culture’, ‘Education’ and ‘Housing’, are showing projects with special relationship to their local context and environmental issues.
11.12.20
RESTAURATION OF A LISTED HOUSING COMPLEX
The Yearbook of Architecture presents a selection of contemporary architectural projects around varying themes in Austria, Gemany and Switzerland. Excellent architecture is informed by complex relationships, as a response between individuality and contextual demands, under consideration of economy and sustainability. Five chapters, focussing on spaces for human presence in architecture follwing the Titles of ‘Corporate’, ‘infrastructure’, ‘Culture’, ‘Education’ and ‘Housing’, are showing projects with special relationship to their local context and environmental issues.
11.12.20
RESTAURATION OF A LISTED HOUSING COMPLEX
The Yearbook of Architecture presents a selection of contemporary architectural projects around varying themes in Austria, Gemany and Switzerland. Excellent architecture is informed by complex relationships, as a response between individuality and contextual demands, under consideration of economy and sustainability. Five chapters, focussing on spaces for human presence in architecture follwing the Titles of ‘Corporate’, ‘infrastructure’, ‘Culture’, ‘Education’ and ‘Housing’, are showing projects with special relationship to their local context and environmental issues.
30.03.20
RESTAURATION OF A LISTED HOUSING COMPLEX
Research into the historic design and construction with proposals of restoration as part of the urban planning support program 'active city and neighbourhood centres' (Aktive Stadt- und Ortsteilzentren) for the listed housing complex of the 1920s. The design proposals for windows, roof and colour scheme will now be realized with support of public funding.
03/25/20
COVID 19 - MEASURES
Our office responds to the current crisis situation with the following changes to protect everyone involved:
• Meetings in our practice will be reduced to the necessary and replaced by videoconference, phone or mail.
• Current work will be transferred to home offices , the presence in the office limited to the necessary under full consideration of safety measures and hygienics
• The office will continue uninterrupted with all projects to ensure the agreed quality of work, deadlines and project schedules. As usual we will be fully present for all project partners, consultants and clients by phone and mail.
We are confident that we are able to ensure the swift progress of all work with no loss and full respect for health and safety. Should there be any delay or limitation in communication despite our efforts please contact us. We will do our best for immediate improvement.
Thank you for your support and understanding !
Stay healthy !
12/24/19
MERRY CHRISTMAS
We wish our clients, project partners, consultants, colleagues and friends Merry Christmas, a Happy New Year and a peaceful festive time. We would like to express our thanks for the good cooperation and the togetherness in 2019.
Please note that the office will be closed between the days of 23. 12. 2019 - 06. 01. 2020.
15.12.19
ADVENT IN DASING
We are very happy to be able to contribute to the further upgrading of the town center with the planning of the new town hall.
To get in the mood for our new project, we visited the Christmas market in Dasing. With the great commitment of the townspeople, the markets take place between the Maypole and the illuminated church tower on 2 Avent Sundays.
10/28/19
NEW TOWN HALL DASING
In a two-stage-tendering procedure with design competition the proposal for a new urban heart convinced the client. Three buildings, one existing which is to be converted, and two new will define several public spaces as new village centre. Stepping in height between the Bavarian Maypole at the lower end and a historic walled church at the higher end these public spaces offer a new experience of the village heart, traffic free, pleasant to stay, for casually meeting with a neighbour or small public events. The new buildings will be traditional in shape and materiality yet modern in design and detailing.